Campus Utilities
Project Team
Location:
SRP-MIC, AZ
Completed:
2015
Size:
1200 LF
Cost:
$1.1M
Details:
(MayDall)
This project involved the installation of approximately 700 linear feet of 8-inch PVC water line, 650 linear feet of 8-inch PVC sewer line, and 1,200 linear feet of 14-inch insulated steel pipe (chilled water line) to support the future Data Center constructed on the SRP-MIC Government Campus. The work also included various points of connection to existing infrastructure. Due to the project’s location in the heart of the SRP-MIC main campus, strict adherence to public safety protocols was essential throughout the construction process. This ensured minimal disruption to the campus community while maintaining safety standards in a high-traffic, sensitive area.