Chaparral Road Water and Sewer

Project Team
David Dallas

David Dallas

President

Melissa Tolbert

Melissa Tolbert

Assistant Project Manager

Location:

SRP-MIC, AZ

Completed:

2024

Size:

4500 LF

Cost:

$4M

Details:

The scope of work for this project included the excavation and installation of critical infrastructure to support the area’s development. This involved the installation of 2,000 linear feet of 2 to 12-inch water mainlines and services, along with 4,500 linear feet of 4 to 18-inch sewer mains and services. Additionally, fire lines were installed, complete with hydrants, fire department connections (FDCs), and air release valves (ARVs). The project also included the connection of Scottsdale Community College to the SRP-MIC water supply, ensuring a reliable and integrated water system for the campus.