top of page
Dobson Heights Water and Road Improvements
Project Team
Location:
SRP-MIC, AZ
Completed:
2023
Size:
1 mi
Cost:
$1.5M
Details:
The work for this project included the replacement of an existing water main and water service lines by installing a new 8-inch PVC water main, along with ¾-inch and 1-inch HDPE water service lines. The project also involved the installation of meters for 28 existing houses, fire hydrants, valves, and other necessary water line appurtenances. In addition to the utility work, the project required the removal and replacement of existing AC pavement and subgrade, as well as selective removal and replacement of curb, gutter, and sidewalk to ensure proper infrastructure for the area.